Related News

On the design and capital raising of theme park from the perspective of operation-6
March 25, 2020As a design unit, the designer will constantly require Party A to raise funds for its operation during the design process, while Party A will ask the designer, your design unit is professional, we have given you design fees, so you should design my projecview
Water park equipment need to pay attention to the continuous operation
July 4, 20191. At present, the water park has become a sunrise industry, and the water park equipment everywhere have sprung up. Here, we listed some questions that need to be paid attention to in the sustainable operation of the water park.view
Analysis Before Start Water park slide
July 7, 2017There is general agreement that the water park slide development process begins with the preparation of a market and financial feasibility study. So, what is a feasibility study and what is intended to accomplish?view
The world's only water park built on the desert opened to the public --- Xiangshawan water park
July 10, 2020In order to activate the tourism market, speed up thepromotion of tourism consumption, improve the quality and upgrade of tourismconsumption, in order to let tourists have a better tourism experience,...view
Control three aspects for water slide
June 29, 2020An ideal water park should allow visitorsto experience different water slides in a certain period of time according tospecific routes, and then visitors will get rich, continuous and rhythmicfeeling o...view
Nanjing Dragon Valley will be completed this year and open to the public
May 11, 2020Nanjing Dragon valley Indoor Park with a total construction area of about 700,000 square meters. The project covers five major functional areas. After completion, it will become a tourism complex integrating tourism, leisure and entertainment. The water pview
English
Chinese
français
Español
русский
português
العربية
tiếng việt
ไทย
Pilipino
Indonesia
Afrikaans
info@gzhaisan.com
+86 13527814016
+86 13527814016
