Water park design steps

Water park design steps

From the beginning to the construction of the project, the water park design plan can be divided into the following seven stages:
1. Planning It was the original source of the project. Mainly for some preliminary thinking of the water park project, including: analysis of higher-level conditions, theme positioning, market positioning, site selection, intention layout mode, basic content planning, etc.

2. Feasibility study At this stage, the feasibility of project planning is verified technically and economically, including policy research, market analysis, planning program research, preliminary investment estimation, financial analysis, impact analysis, and risk analysis, etc., are important links in determining whether the project is established.

3. Master plan After the location is determined, the overall layout and arrangement of the base in time and space will be carried out. At this stage, it is necessary to clarify the scope of land use, land use indicators, building requirements, and supporting facilities.

4.Concept design After the project is settled, the concrete water park design plan is formally invested. Settlement theme story, architectural style, floor plan, moving line setting, water play project configuration, business / service / management facility configuration.

5. Scheme design Continuing the conceptual design stage, comprehensively launching various water park design work, and carrying out special design for architecture, exterior, interior, landscape, lighting, and electrical.

6. Initial design Based on the design of the plan, the façade, size, color, etc. are clarified, and details are marked.

7, construction drawings Implement all design results into construction documents for construction bidding and subsequent construction guidance.

Related News
  • First part:Key issues in design and construction of water park

    First part:Key issues in design and construction of water park

    November 14, 2019There are many problems involved in the design and construction of the water park. Here are some places that are easy to be ignored or made mistakes in the process.1. Pipe network designOne of the big...view
  • How to Prepare for the Opening of the Water Park After the Epidemic

    How to Prepare for the Opening of the Water Park After the Epidemic

    May 12, 2021The sudden epidemic has brought a huge impact on the global tourism industry. It can be predicted that the operation pressure of water parks will be very big. Crisis is often accompanied by the advent...view
  • Defining Success Of Water Park

    Defining Success Of Water Park

    September 7, 2017For private developers, the definition of success is simple … to make money! For municipal waterparks, however, the definition of success can be:Earn revenues that cover its costs and any future expa...view
  • Four Points to Know when Operating Water Park Facilities

    Four Points to Know when Operating Water Park Facilities

    January 19, 2023In recent years, the water park project has grown strongly and developed rapidly, becoming a bright spot. With the gradual transformation and upgrading of the water park, its business management model...view
  • 3 Ways to Maximize Your Fun at a Water Park

    3 Ways to Maximize Your Fun at a Water Park

    July 6, 2017In many ways, a visitor to a water park shouldn’t have to maximize her fun; it should be built into the very fabric of the place and the experience that can be had there. From slides to wave pools, a...view
  • Classification of Water Parks

    Classification of Water Parks

    November 2, 2020Water park investors plan to build water parks, but what kind of water park should be built? How large the water park should be? Water park equipment manufacturers will tell you the classification of ...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us