Water park is one of the most popular theme tourism products in recent years. Generally speaking, the construction period of the water park is 6 to 18 months, the first two years are the return period, and the third year is the profit period. If the water park has been in a non return state, it has a direct relationship with its scheme planning and planning. How to better and faster promote the project construction and realize the landing operation? Here is a summary of the following eight processes.

Investment cost

1. Site and civil cost           

The site cost and civil construction cost of the water park are the largest proportion of the investment of the water park, usually accounting for more than half of the total investment, of which the construction cost of the civil construction part and the equipment cost of the water park account for about 1.8:1.           

2. Equipment investment           

Including water slide, wave making equipment, water playing equipment and other supporting facilities. The cost of water park equipment is second only to that of site civil engineering.            3. Operating cost investment           

Including labor, advertising, service and other costs, operation planning can be adjusted by itself.

Water park design process

1. Investment planning           

Investigate the market, economy and peer competition of the project site, determine the market positioning of the project, determine the reasonable investment amount of the project and the investment ratio of each functional module.           

2. Brand planning           

According to the idea of investment planning, based on market positioning and attraction building, determine the project brand strategy and competition strategy. From the perspective of target consumer groups and future marketing of the project, entertainment creativity is carried out, the highlights and selling points of the project are planned, and differentiation is created.            3. Design planning           

According to the idea of investment planning and brand planning, we will transition to design implementation, and comprehensively organize and deepen the design content around the characteristics and differences of the project. Determine the construction content and functional zoning, select the architectural style, cultural theme, water park equipment and analyze the feasibility, and provide the requirements or guidance on the control technical indicators for the follow-up design.            

4.General planning and design           

Through the general planning design drawing to express the construction content and layout of the project, determine the spatial position relationship of each functional area of the project and the connection relationship with the outside, propose the main landmark building modeling scheme and important node landscape scheme, point out the design key points, and reasonably arrange the water park equipment.           

5. Preliminary design           

According to the general planning design drawing, the specific design of the zone will be deepened, the key contents of entertainment creativity and core project will be detailed, and the technical solutions and main parameters will be determined.           

6. Construction drawing design           

Prepare detailed general drawings, detailed drawings of disciplines and construction budget, and express technical requirements such as specific dimensions, materials and practices of each detail.




Related News
  • An Analysis of China's Water Park Issues - part one

    An Analysis of China's Water Park Issues - part one

    April 9, 2020The time has come to the second decade of the 21st century. Looking back at the first decade of this century, everyone who is familiar with the domestic amusement industry knows that this is a decade of rapid development of the Chinese amusement industry.view
  • Large-Scale Compound Water Park Equipment-Standard of The Water Park

    Large-Scale Compound Water Park Equipment-Standard of The Water Park

    February 25, 2017In recent years, with the development of the water park, a single function of the water park equipment less and less, most of them tend to large-scale compound water park equipment.view
  • Hasan Group Travel 2017

    Hasan Group Travel 2017

    January 15, 2018In 2017, the staff tourism (first batch) of Haisan was successfully concluded.In order to express its appreciation to the staff unremitting efforts for the company development, and enrich employees' c...view
  • How to have a water park with

    How to have a water park with "0" safety accidents?(1/2)

    January 14, 2020How to have a water park with "0" safety accidents?(1/2) As the summer approached, the water park also reorganized and was ready to open its doors for hospitality. A safe amusement environment is an important factor in promoting tourists to revisit. Forview
  • Market Dynamic of Water Park Equipment

    Market Dynamic of Water Park Equipment

    July 7, 2017The ancients ever said that ”Inspecting the past and then regular a state". Learning experiences from past and now, tapping into the future and being in line with the future development will provide beneficial guidance for present park’s management and coview
  • How to be a valuable IP for a water slide?

    How to be a valuable IP for a water slide?

    May 18, 2020For a valuable IP, it should have the following basic conditions: 1. High visibility. Being familiar with the target customer base is the minimum requirement. This may mean constant product and publicity investment in an IP.view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us